The Hardest Possible R15
-
- All Zones
- Posts: 1218
- Joined: 17 Apr 2006, 16:45
- Location: Zone 900
Re: The Hardest Possible R15
What makes a tough set is engineering works which occur most weekends. North Acton is a pain if central part of the central line is closed.
26 miles 385yards in 4h 14m 40s.
-
- All Zones
- Posts: 1229
- Joined: 16 Mar 2015, 00:35
Re: The Hardest Possible R15
Yes, the stations mentioned on the Z2/3 boundary almost all get harder to visit in the event of engineering work.
I seem to remember that on one of the more recent challenges, the Bakerloo was closed south of Willesden
Junction. Perhaps fortunately, WJ didn't appear on the list!
I seem to remember that on one of the more recent challenges, the Bakerloo was closed south of Willesden
Junction. Perhaps fortunately, WJ didn't appear on the list!
272 stations in 18:30:32
The only person to have used a boat in a Random 15 Challenge!
The only person to have used a boat in a Random 15 Challenge!
-
- The Twilight Zone
- Posts: 4249
- Joined: 24 Jan 2015, 07:57
- Location: London Waterloo
Re: The Hardest Possible R15
That wouldn't be too difficult, surely, assuming the Overground was still running to Euston?
Tumbleweed and former Nimbleweed Scorekeeper
Winner of Gumbleweeds V, VI + XI, Nimbleweeds I, III - IX + XIV and (joint with GuyBarry) winner of Timesnap
And most importantly, Former leader of Tumbleweed, and first person to 250,000
Winner of Gumbleweeds V, VI + XI, Nimbleweeds I, III - IX + XIV and (joint with GuyBarry) winner of Timesnap
And most importantly, Former leader of Tumbleweed, and first person to 250,000
-
- All Zones
- Posts: 1229
- Joined: 16 Mar 2015, 00:35
Re: The Hardest Possible R15
IIRC the closure was due to engineering work at Queens Park affecting both the Bakerloo line and LO.
272 stations in 18:30:32
The only person to have used a boat in a Random 15 Challenge!
The only person to have used a boat in a Random 15 Challenge!
Who is online
Users browsing this forum: No registered users and 62 guests