Page 1 of 1
Planned Engineering Work
Posted: 16 Jul 2012, 08:04
by nozzacook
Can anyone remember when the planned engineering calender was so empty.
http://www.tfl.gov.uk/livetravelnews/pl ... fault.aspx
Re: Planned Engineering Work
Posted: 16 Jul 2012, 08:40
by Soup Dragon
How strange, I wonder why this is

Last time I can remember it like this was 29/12/07

Re: Planned Engineering Work
Posted: 16 Jul 2012, 08:51
by tubeguru
Olympic propaganda at its best.
Re: Planned Engineering Work
Posted: 16 Jul 2012, 09:23
by moley
One could argue that it is still wrong as it shows the W&C line as closed on Sundays which it wont be during the Olympics.
Re: Planned Engineering Work
Posted: 16 Jul 2012, 09:27
by tubeguru
I bet it's costing them a fortune to hold off the engineering works until after the Olympics.