Page 2 of 2

Re: S stock on the Met.

Posted: 03 Aug 2010, 07:43
by al
garion24wales wrote:PVR? Or am I just being tired and having a blonde moment?
PVR = Peak Vehicle Requirement, in other words the number of trains (in this instance) needed at the busiest time of day to cover all the trips scheduled. It is a key figure in the transport industry, as first and foremost the engineering department is trying to supply enough vehicles to hit this figure.

Re: S stock on the Met.

Posted: 03 Aug 2010, 13:48
by Garion
Ahh thanks :)