Zone 1 start/finish?

Post by quisquidillius » 03 Aug 2016, 14:49

Hello, has anybody ever done a start or finish in Zone 1? I know that Zone 2 has been done before (Olympia). Also, which other weird starts have been done? I'd be interested in seeing these weird routes.
Zone 1 Challenge (Olympics 2016): 3:44:31.67 - we were very unlucky indeed!
South London Challenge (Summer 2016): 1:58:40 - going to try again soon!
All Lines Challenge (August 2016): 44:38 - happy with this ... For now!

User avatar
Steeevooo
All Zones
Posts: 1068
Joined: 14 Jul 2005, 11:23
Location: Rainham, Essex

Re: Zone 1 start/finish?

Post by Steeevooo » 03 Aug 2016, 15:22

I believe that Bob Robinson started an attempt at Temple

RJSRdg
Zone 6
Posts: 740
Joined: 16 Mar 2015, 00:35

Re: Zone 1 start/finish?

Post by RJSRdg » 03 Aug 2016, 17:59

Last year's Cannon Street run was a Full Network (I assume this is what we're talking about here), starting at Cannon Street. I can't remember if anyone completed or not.

But generally speaking FNCs don't tend to start in Zone 1 because it requires doublebacks to three of Amersham/Chesham, Heathrow, Upminster and Epping whereas most FNCs reduce the number of long doublebacks by starting at one of those places.
Currently 4th place in the Bottle Challenge league table
Currently 3rd place Zone1/Zone 2 Challenge

User avatar
The Orange One
All Zones
Posts: 2597
Joined: 18 Jun 2013, 14:23
Location: Three metres due south of you. Wherever you are.
Contact:

Re: Zone 1 start/finish?

Post by The Orange One » 03 Aug 2016, 18:09

I don't know any really weird ones apart from the Cannon Street one!! For odd routes I've heard of Wimbledon to Morden, Cockfosters to High Barnet, Richmond is a surprisingly common start/finish point.

Actually, I believe I saw a Wembley Park to Canning Town mentioned at some point...
All London buses: 23 hours 25 minutes (with Adham, David, Josh and Tangy)
Holds some alternative challenge records. Not sure which ones.
20½ Random 15 challenges: 01:58:48 best
That guy who runs those Twitter polls about tube stations and London Boroughs.

RJSRdg
Zone 6
Posts: 740
Joined: 16 Mar 2015, 00:35

Re: Zone 1 start/finish?

Post by RJSRdg » 03 Aug 2016, 22:25

I can see the logic of a Cockfosters-High Barnet route. That's a pain of a transit and takes at least 20 minutes, eliminating it would go some way to balancing out an extra long doubleback (Heathrow T5 to Paddington could be done in under 20 minutes if you were prepared to fork out for the Heathrow Express).
Currently 4th place in the Bottle Challenge league table
Currently 3rd place Zone1/Zone 2 Challenge

DrainBrain
Zone 6
Posts: 922
Joined: 04 Jun 2013, 09:42
Location: South of the Thames

Re: Zone 1 start/finish?

Post by DrainBrain » 04 Aug 2016, 08:09

If you did High Barnet to Cockfosters you could also time it for a good Mill Hill East visit.

Nobody finished the Cannon Street FNC. Some plans there were to start and finish in Zone 1, which is a bit crazy.
Royal Oak to Bethnal Green in 333 days
Heathrow Terminal 4 to Amersham in 17 hours, 42 minutes and 22 seconds