Steeevooo wrote:You're not still adamant that the system is a lot better now than before are you?
Service Update during rush hour:

Bakerloo
Good Service

Central
Good Service

Circle
Good Service


You get the idea....

It formed part of a long-standing internal argument in the school over whether to use the tube or not.
1 FNC Completion (PB: 17:18:18 with G Bryant, A Chilcraft, I MacNaughton)
4 Zone Ones (PB: 03:00:35 with G Bryant)
15 R15s (PB: 01:55:48 with T Cooling and R Jackson)
11 All Lines (PB: 00:44:03)
Winner of the 2014 Formula 1 Side Competition
User avatar
Steeevooo
All Zones
Posts: 1148
Joined: 14 Jul 2005, 12:23
Location: Rainham, Essex

Re: The Next Big Change to the Tube Network

Post by Steeevooo »

When is your rush hour?!! During the Evening peak today, the Central line was part suspended, the H&C line was part suspended, the District line was part suspended. You get the idea...
User avatar
Sam
The Twilight Zone
Posts: 4240
Joined: 19 Jul 2005, 13:14
Location: Forest of Dean
Contact:

Re: The Next Big Change to the Tube Network

Post by Sam »

Listening to magic radio at the hospital at 18:30, the lady presenter was advising people to stay in the office due to how bad the problems on the tube were! Yeah, good service indeed :lol: :roll:
:D First and so far only female solo record holder!! :D

Ze forum's female train driver
geofftech
All Zones
Posts: 1102
Joined: 03 Feb 2005, 20:35
Contact:

Re: The Next Big Change to the Tube Network

Post by geofftech »

indeed! came off the Vic last night, changed to the Central to go home .. found it screwed. walk up Great Portland Street (to go via a shop i wanted to go to), got to GPS .. H&C screwed! ended up walking down the Euston Road to Euston and got the Overground out of there to Willesden Junction and down to Acton to get home. Just another 'Good Service' day of the tube. (LOL as Iain's "Just the four severe delays")

the point about the 'Good Service' is that an advertised 'Good Service' does NOT mean that the trains are running as they are timetabled to! it's such an outrageous lie. i have repeatedly missed connections on tube challenge days when trains have been 2, 5, sometimes 10 minutes late (and sometime not show up at all!) and yet be told there is a 'Good Service'. it's a crock of shit, and I never pay any attention to it.
User avatar
Steeevooo
All Zones
Posts: 1148
Joined: 14 Jul 2005, 12:23
Location: Rainham, Essex

Re: The Next Big Change to the Tube Network

Post by Steeevooo »

Indeed - further to the "Good Service" myth that Geoff has mentioned above, I would like to know why, upon arriving at Stratford this morning to "Good service" announcements, that there was not a single Jubilee line train in the platforms and that it was over 10 minutes until one did eventually arrive and depart.
User avatar
Iain
All Zones
Posts: 2155
Joined: 11 Nov 2011, 11:26
Location: Sutton

Re: The Next Big Change to the Tube Network

Post by Iain »

I was up shortly after 6:00am this morning - three lines partly suspended.
Full Network: Three completions, Best time: 17:18:18 - thanks Glen, Andrew and Rhys!
Former DLR 45 station record holder (with Glen, Andi and Stevo) - 2h:08m:57s
All lines: 46:11 (6th equal)
Zone One 2:52:51 (thanks Glen)
MylesHSG
Zone 5
Posts: 459
Joined: 10 Jul 2011, 00:21
Location: Rayners Lane/South Harrow

Re: The Next Big Change to the Tube Network

Post by MylesHSG »

I think HT has lost this arguement :o
The King is back! Long live The King!
User avatar
Steeevooo
All Zones
Posts: 1148
Joined: 14 Jul 2005, 12:23
Location: Rainham, Essex

Re: The Next Big Change to the Tube Network

Post by Steeevooo »

MylesHSG wrote:I think HT has lost this arguement :o
He's a wannabe politician - therefore he never loses any argument...
User avatar
Going Underground
The Twilight Zone
Posts: 8796
Joined: 11 Apr 2006, 12:24
Location: Down in a tube station at midnight.
Contact:

Re: The Next Big Change to the Tube Network

Post by Going Underground »

Perhaps it's just me I don't think any of my attempts have been without problems and delays... I assume this is just the norm, par for the course and to be expected........
Look at the sheer size of the network, number of trains running at any one time, thousands of signals, hundreds of miles of track... A thousand and one things that can go wrong......Over running engineering works, burst water mains, WW2 bombs being found, signal failures, one under's, staff being taken sick, defective trains etc...

It is a brilliant transport system and I cannot believe how you can possibly expect all of this to operate without daily problems and issues.....
Twice former full network GWR holder and former Zone 1 Olympic and World Record holder with The Raven and Soupie
Tube personality of the year 2009
Twice Winter Olympic Biathlon Gold Medalist with The Beer Baron
2008 All Lines Olympic Gold
nozzacook
All Zones
Posts: 1218
Joined: 17 Apr 2006, 16:45
Location: Zone 900

Re: The Next Big Change to the Tube Network

Post by nozzacook »

This all goes back to the perfect day debate. The other thing to consider is that nearly half a million more people use the tube every day compared to 2005 so any delay impacts that many more passengers.

2004/2005 ave daily passengers 2.67 million
2010/2011 ave daily passengers 3.15 million.

Dec 7th 2010 was the tubes busiest day with 4.17 million passengers travelling.
This I expect will be beaten this year during the Olympics.

Anyway In my opinion you need a huge slice of luck regarding the network to get the record.
And that just adds to the Challenge.
Last edited by nozzacook on 29 Feb 2012, 17:02, edited 1 time in total.
26 miles 385yards in 4h 14m 40s.
User avatar
RichieG
Zone 6
Posts: 894
Joined: 24 Sep 2008, 21:48
Location: Still getting lost between Aldgate and Aldgate East

Re: The Next Big Change to the Tube Network

Post by RichieG »

Also don't forget that sometimes late-running trains can be a bit of a blessing...so sometimes you don't *want* the network to be right :p
Attempts: 2 (17h38m, 238 stations) (unknown, 200 stations); Completions: 0; GWR: 0; PBs: 0.
#####################################
The Richie G website: occasionally frequently updated.
hopeful traveller
All Zones
Posts: 1398
Joined: 15 Jul 2011, 16:28

Re: The Next Big Change to the Tube Network

Post by hopeful traveller »

It's what I said... when it breaks down, it breaks down together.

Interestingly, the two lines officially upgraded didn't fail...
1 FNC Completion (PB: 17:18:18 with G Bryant, A Chilcraft, I MacNaughton)
4 Zone Ones (PB: 03:00:35 with G Bryant)
15 R15s (PB: 01:55:48 with T Cooling and R Jackson)
11 All Lines (PB: 00:44:03)
Winner of the 2014 Formula 1 Side Competition
barrykas
Zone 4
Posts: 264
Joined: 03 Aug 2005, 01:52
Location: Edmonton, North London, UK

Re: The Next Big Change to the Tube Network

Post by barrykas »

Even on a "perfect" day with no faults or failures of trains or infrastructure, I can guarantee that trains won't run according to the Working Timetable thanks to the people that cause the best laid plans to go wrong...namely the passengers!

Case in point: I boarded an Overground train at Kenny O recently and some twunt decided it would be a good idea to hold/force the doors open whilst they were closing. This promptly broke the set of doors in question and it took two members of staff nigh on ten minutes to get them closed and locked out of use so the train could proceed, and at one point they were even considering taking the train out of service.

There WILL be extended dwell times, trains being held in platforms to regulate the service, trains being turned short of their booked destination, trains being "reformed" and various other things that put a spanner in the works for challenge purposes, yet still enable LU to proclaim a "Good Service" because average frequencies are unaffected.

Cheers,

Barry
--
Barry Salter, barry (at) southie (dot) me (dot) uk
Nigel
Zone 5
Posts: 640
Joined: 06 Jan 2008, 19:04
Location: Woodford

Re: The Next Big Change to the Tube Network

Post by Nigel »

palkanetoijala31 wrote:Besides when 2016 comes along who ever gets it wont be on Guinness Website it still be Marc Gawley
I don't know when it was updated, but at long last the Guinness website now seems to be showing the correct record:
http://www.guinnessworldrecords.com/wor ... d-stations
palkanetoijala31

Re: The Next Big Change to the Tube Network

Post by palkanetoijala31 »

It was only updated recently 9 months of badgering to do it though hope the next record holder gets the same wait lol.